PROJECT TECHNICAL CONCEPT-SATNA UNIT
Plant Location
The plant is proposed to be located, in the Village, Birhauli in Tehsil RaghuRaj Nagar of Satna District, Madhya Pradesh.
It is located at about 8 kms from Satna town and the nearest railway station is around 12 km away.
Infrastructure
Land
The land required for the Clinkerisation Plant is approx. 235 acres.
Road Network
Plant is located at about 8 kms from Satna town and the nearest railway station is around
12 km away.
Power
The maximum estimated power demand for the plant is 14 MW.
It is proposed to meet the power requirement from grid. or any other source, a D.G. set of 5 MW
shall be installed to meet the power demand during stoppage / power tripping
Water
Total water requirement is expected to be around 1725 m3/day.
Social Amenities
There is a need for developing a full-fledged township near the plant. Thus, township having
essential facilities for key plant technical personnel / visitors shall be developed near the plant site.
Environmental Aspects
The mines area and the proposed plant site are environmentally sensitive. A
comprehensive Environmental Impact Assessment (EIA) study has been carried out
accordingly, and requisite Environment Management Plan (EMP) is prepared,
based on EIA study.
Raw Materials and Fuel
The Raw Material required for producing Cement is:
Limestone
Limestone Requirement – 1.67 mio tpa
The limestone required from mines for producing clinker shall be sourced from Ispat
Limestone Quarry (ILQ) adjoining to plant site.
The limestone shall be transported by dumpers from mines to Plant.
Laterite
Laterite requirement – 0.07 mio tpa
Laterite shall be sourced from Katni or other near by areas.
Coal
Coal Requirement - 0.18 mio tpa
Coal is proposed to be sourced from Central Coal fields.
|